Connecticut Watering Restrictions, Wetlands Setbacks, and Lawn Laws by Town
Pick your town below, or read the statewide rules first. Every row shows where the rule comes from and when it was last checked.
Maintained by the crew that handles sod installation across Connecticut. Massachusetts has its own page: the Massachusetts water restrictions and lawn rules by town.
By CT Sod · Published September 3, 2026
Find your town
Statewide rules
Connecticut regulates lawns in three layers. The state bans phosphorus fertilizer on established lawns, bans all phosphate fertilizer from December 1 through March 15, and keeps it 20 feet from any water body, but sets no nitrogen limits and no other blackout dates.
Each of the 169 towns runs its own inland wetlands agency, and the distance from a wetland or stream inside which grading, adding topsoil, or clearing for a lawn needs a permit is set town by town, from 50 feet in New Canaan and Stamford to 100 feet in most towns and 150 feet in Greenwich's water supply watersheds.
Watering rules come from your water company, not your town: Aquarion's mandatory twice-weekly sprinkler schedule runs April 1 through October 31 in 25 Connecticut towns, with a five-week new planting variance that is only granted in spring and fall. On top of that, a growing list of towns restricts when landscape crews can run gas leaf blowers.
The phosphorus law (every town)
CGS 22-111yy, from Public Act 12-155, in effect for applications since January 1, 2013
Connecticut passed its lawn phosphorus law in 2012 because phosphorus is the primary driver of algae and oxygen loss in the state's freshwater lakes and ponds, and lawn fertilizer was one of the three sources the Legislature could reach, alongside wastewater plants and failing septic systems. The law covers fertilizer, soil amendments, and compost that contain phosphate.
What CGS 22-111yy says
| Rule | Requirement | Notes |
|---|---|---|
| Established lawns | No fertilizer, soil amendment, or compost containing phosphate on an established lawn. | "Established lawn" means grass cover for at least two growing seasons that is customarily kept mowed. |
| Exception 1: soil test | Allowed if a soil test using a method approved by the Commissioner of Agriculture, performed within the previous two years, shows the soil lacks phosphorus and the product is needed for the lawn's growth. | UConn's Soil Nutrient Analysis Laboratory is the standard in-state test. |
| Exception 2: new lawns | Allowed when establishing new grass or repairing a lawn with seed or sod. | This is the sod-install exception. Starter fertilizer at installation is legal. |
| Seasonal ban | No phosphate-containing product on any lawn from December 1 through March 15. | Applies to new lawns too; there is no new-lawn carve-out from the winter ban. |
| Water buffer | No phosphate-containing product on any portion of a lawn within 20 feet of a brook, stream, river, lake, pond, sound, or other water body. | Reduced to 15 feet if applied with a drop spreader, a rotary spreader with a deflector, or targeted liquid spray. |
| Impervious surfaces | No application to any impervious surface, defined to include porous paving, paver blocks, gravel, crushed stone, decks, patios, and elevated structures. | Sweep spills back onto the lawn. |
| Low-phosphate products | Products with 0.67 percent or less phosphate are exempt from the restrictions. | Check the middle number on the bag. |
| Who is exempt | Land classified as agricultural land under CGS 22-26bb, and golf courses. | |
| Penalty | $500 civil penalty per violation, assessed by the Commissioner of Agriculture. |
What Connecticut does not regulate
There is no statewide cap on nitrogen, no slow-release requirement, no calendar blackout for nitrogen-only fertilizer, and no statewide distance rule for nitrogen. Compare that with Massachusetts and Cape Cod, where towns cap nitrogen at 1.0 pound per 1,000 square feet per application and prohibit all fertilizer from November 12 through April 14 — see the Cape Cod fertilizer regulations. UConn's own guidance goes further than the law, recommending no fertilizer of any kind from October 15 to April 15 when turf is not actively growing. A few Connecticut towns add their own rules; those appear in the town sections.
Wetlands and the 100-foot question
Inland Wetlands and Watercourses Act, CGS 22a-36 through 22a-45
Connecticut defines inland wetlands by soil type, not by standing water: poorly drained, very poorly drained, alluvial, and floodplain soils as mapped by the National Cooperative Soil Survey. A dry lawn can be a regulated wetland. You can check your parcel on the state wetlands viewer to see the mapped soils, but only a certified soil scientist's field delineation is binding — the map is a screening tool, not the boundary.
Every municipality must have an inland wetlands agency — some call it the Conservation Commission, Environmental Protection Commission, or Environmental Protection Board. That agency, not the state, issues permits for regulated activities. Each agency sets an "upland review area," a fixed distance from any wetland or watercourse inside which clearing, grubbing, filling, grading, excavating, depositing or removing material, and discharging stormwater are regulated activities. DEEP's guidance suggests 100 feet; towns adopt anywhere from 50 to 200 feet, often with a wider distance inside public water supply watersheds. An agency can also regulate activity outside that distance if it is likely to affect a wetland.
Strip an old lawn, spread topsoil, regrade, and lay sod inside the upland review area and you have performed a regulated activity. Most residential sod jobs are outside it. The ones near a pond, a stream, a wet corner of the lot, or the coast are not, and the permit has to exist before the first machine arrives.
Agencies must act on a complete application within 65 days; public hearings are required when the activity may have a significant impact or when 25 residents petition. Enforcement runs against the owner and the contractor. New Canaan's ordinance, for example, makes each citation apply jointly and severally to the owner and "his/her agents, contractors and subcontractors," with each day a separate offense.
Tidal wetlands are regulated by the state under CGS 22a-28 through 22a-35, and coastal towns review shoreline work under the Coastal Management Act, so a waterfront lawn can sit under two or three reviews at once.
The distance that applies to you is in your town's row below.
The coastal law
Connecticut Coastal Management Act, CGS 22a-90 and following
Municipalities along Long Island Sound and the tidal reaches of its rivers must review certain activities within the coastal boundary through a coastal site plan review by the planning and zoning commission. Tidal wetlands themselves are DEEP jurisdiction.
For a lawn this matters when the work involves grading, fill, or shoreline changes on a waterfront lot; a straight sod replacement on an existing lawn usually does not trigger it, but the town decides. The Act defines the coastal area as Long Island Sound plus 36 municipalities: Greenwich, Stamford, Darien, Norwalk, Westport, Fairfield, Bridgeport, Stratford, Shelton, Milford, Orange, West Haven, New Haven, Hamden, North Haven, East Haven, Branford, Guilford, Madison, Clinton, Westbrook, Deep River, Chester, Essex, Old Saybrook, Lyme, Old Lyme, East Lyme, Waterford, New London, Montville, Norwich, Preston, Ledyard, Groton, and Stonington. Inside each of them the coastal boundary line is narrower than the town line and the town's coastal map controls, so being in a coastal town does not mean every lot gets coastal review. Those towns' rows below read "Coastal review: yes"; every other town reads "No."
Erosion and sediment control: the half-acre rule
Soil Erosion and Sediment Control Act, CGS 22a-325 through 22a-329
Connecticut's Soil Erosion and Sediment Control Act (1983) required every municipality's zoning and subdivision regulations, as of July 1, 1985, to demand a soil erosion and sediment control plan with any application for development that disturbs more than one-half acre, with the plan certified by the town or the local soil and water conservation district. The technical standard is the Connecticut Guidelines for Soil Erosion and Sediment Control — the 2002 edition, replaced by the 2023 edition dated September 30, 2023.
What that means for a lawn: stripping, regrading, and re-sodding more than 21,780 square feet in one project is "development" that disturbs more than half an acre in most towns' regulations. Many towns exempt a single-family house that is not part of a subdivision — Wethersfield and West Hartford's codes say so explicitly — but the exemption is written town by town, so a large estate lawn should be checked with Planning and Zoning before the topsoil arrives. Projects disturbing more than one acre that are not reviewed by a local commission, and any project disturbing five acres or more, must register with DEEP under the Construction Stormwater General Permit and have a Stormwater Pollution Control Plan prepared by a qualified professional.
One more call belongs on the same checklist: regrading with machines triggers Connecticut's Call Before You Dig law (CGS 16-345 and following), which requires utility mark-outs through 811 before the digging starts. It is the same system Massachusetts runs as Dig Safe.
Note
Connecticut also prohibits lawn care pesticide applications on the grounds of day care centers and public and private schools through grade 8 (CGS 10-231b), and extended similar restrictions to municipal playgrounds. This matters for commercial and municipal sod work, not homeowners.
Leaf blowers
A 2024 Office of Legislative Research report (2024-R-0177) identified five Connecticut towns with restrictions on leaf blowers or lawn equipment: Greenwich, Norwalk, Stamford, Wallingford, and Westport. In March 2026 the Legislature stripped a statewide gas leaf blower ban out of Senate Bill 319, leaving only Green Bank loans for landscapers buying battery equipment (CT News Junkie, March 19, 2026). Every other town's row below reads "No town ordinance located as of the verified date."
Your water company sets the watering rules
Watering restrictions in Connecticut come from the water utility under authority granted by the Public Utilities Regulatory Authority, not from the town. The same town can have Aquarion customers on a mandatory schedule and well owners with no restriction on the same street. That matters for anyone planning sod delivery in Connecticut — the watering days below decide when a new lawn can go in.
Aquarion mandatory irrigation schedule, April 1 through October 31
| Last digit of house number | Watering days | Hours |
|---|---|---|
| Even (0, 2, 4, 6, 8) or no number | Sunday and Wednesday | 12:01 a.m. to 10:00 a.m., or 6:00 p.m. to midnight |
| Odd (1, 3, 5, 7, 9) | Tuesday and Saturday | 12:01 a.m. to 10:00 a.m., or 6:00 p.m. to midnight |
- Applies to in-ground and above-ground sprinkler irrigation, including hose-end sprinklers. Drip irrigation, soaker hoses, and hand watering are allowed any day, any time.
- No watering on Mondays, Thursdays, or Fridays, and none between 10 a.m. and 6 p.m. on any day.
- The schedule is permanent; it began after the 2016 drought and Greenwich has been on it since 2016.
- Aquarion states the schedule has saved approximately six billion gallons since it began, which is what has let its towns avoid outright watering bans in dry summers (Aquarion, April 2, 2026).
- Towns covered as of 2026 (25 in Connecticut): Bethel, Bridgeport, Darien, East Granby, East Hampton, Easton, Fairfield, Granby, Greenwich, Groton, Monroe, Mystic, New Canaan, Newtown, Redding, Ridgefield, Shelton, Simsbury, Stamford, Stonington, Stratford, Trumbull, Weston, Westport, and Wilton. Bridgeport, East Hampton, Monroe, Redding, Shelton, and Stratford were added for 2026.
- Automatically exempt without a variance: drip, soaker, and hand watering; water from a non-Aquarion source (but your town may restrict well irrigation); irrigating during repair or testing of a system; commercial nursery stock.
- Enforcement: Aquarion monitors consumption, notifies customers who appear to be over-irrigating, accepts anonymous violation reports, and can shut off water service for repeat violations.
Aquarion irrigation variances
| Variance | Who qualifies | What it allows | Window |
|---|---|---|---|
| New Planting | Any customer establishing new sod or plantings | Water any day for five weeks, before 10 a.m. or after 6 p.m.; one two-week extension may be requested | Applications accepted April 1 to June 15 and September 1 to October 31 only. Not accepted June 16 to August 31. |
| Large Property | Properties of two acres or more with a licensed-contractor-maintained system that cannot cover the lot in two days | Any day before 10 a.m. or after 6 p.m., with permit displayed | April 1 to October 31, after a site assessment |
| High-Efficiency | Systems with an EPA WaterSense weather-based controller running in weather-based mode, licensed-contractor maintained | Water outside the schedule in weather-based mode | April 1 to October 31, after a site assessment |
| Golf Course | Eligible golf courses | By arrangement | Contact Aquarion |
Aquarion's own language is that the variance is closed from June 16 to August 31 because "it is difficult to establish new sod or plants" in that heat. For a homeowner on Aquarion water in any of the 25 towns, that means a sod installation planned for July gets two watering days a week during the two weeks the sod needs water every day, unless the property is on a well, hand-watered, or already holds a Large Property or High-Efficiency variance. The practical windows for a new lawn on Aquarion water are April through mid-June and September through October, and the variance application should be filed before the sod is ordered. Here is what the first 14 days of watering new sod actually take.
Other Connecticut water utilities
| Utility | Serves | Watering rule | Status |
|---|---|---|---|
| South Central Connecticut Regional Water Authority | 15 towns: Ansonia, Bethany, Branford, Cheshire, Derby, East Haven, Hamden, Milford, New Haven, North Branford, North Haven, Orange, Seymour, West Haven, and Woodbridge | No standing mandatory irrigation schedule comparable to Aquarion's located as of the verified date; the RWA issues drought advisories when reservoir levels require them — check rwater.com before scheduling a new lawn | Verify |
| Metropolitan District (MDC) | Member towns Bloomfield, East Hartford, Hartford, Newington, Rocky Hill, West Hartford, Wethersfield, and Windsor, plus parts of Farmington, Glastonbury, East Granby, South Windsor, Windsor Locks, and Portland | No standing mandatory irrigation schedule comparable to Aquarion's located as of the verified date; the MDC issues voluntary conservation requests during dry periods and offers rebates for WaterSense smart irrigation controllers and rain sensors — check themdc.org before scheduling a new lawn | Verify |
| Norwalk First Taxing District Water Department and South Norwalk Electric and Water | Norwalk | Verify | Verify |
| Connecticut Water Company | Various | Verify | Verify |
| Wallingford Water Division (municipal) | Wallingford | Verify | Verify |
| Private wells | Any town | No utility schedule; check whether the town restricts well irrigation |
One overlap worth knowing: East Granby appears on both Aquarion's mandatory list and the MDC's partial-service list, so which watering rule applies depends on which company bills the property.

Connecticut towns A to Z
77 towns verified so far, newest batch September 3, 2026. Every other Connecticut town follows the statewide rules and its water company's rules above — use the finder to ask us to add yours.
Bethel
Bethel reviews removal or deposition of material within 100 feet of any wetland or watercourse and is on Aquarion's mandatory watering schedule.
| Wetlands agency and setback | Inland Wetlands Commission. Upland review area 100 feet from the boundary of any wetland or watercourse; regulated activity includes removal or deposition of material within it.bethel-ct.govSource: Bethel Inland Wetland and Watercourse Regulations (bethel-ct.gov) |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Bethel|Sod installation in Bethel |
| Last verified | September 3, 2026 |
Spotted a change in Bethel? Report a change.
Bloomfield
Bloomfield reviews work within 100 feet of wetlands and 200 feet of watercourses and enforces vegetated buffer zones.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission, Town Hall, 800 Bloomfield Avenue. Upland review areas of 100 feet from wetlands and 200 feet from watercourses; the Commission also enforces vegetated buffer zones adjacent to resources and requires mitigation planting where buffer vegetation is cleared.Source: Bloomfield IWWC approved minutes, August 18 and October 20, 2025; Bloomfield Wetlands Regulations |
|---|---|
| Water company and watering rule | Metropolitan District (MDC). No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the MDC issues voluntary conservation requests during dry periods and offers rebates for WaterSense smart irrigation controllers and rain sensors. Check themdc.org before scheduling a new lawn.Verifythemdc.org |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Bloomfield|Sod installation in Bloomfield |
| Last verified | September 3, 2026 |
Spotted a change in Bloomfield? Report a change.
Branford
Branford's 100-foot wetlands review area was upheld by the Connecticut Supreme Court in 2001, and the town is inside the coastal area.
| Wetlands agency and setback | Inland Wetlands Agency, 1019 Main Street. Upland review area 100 feet (as upheld in 2001; confirm the current regulation text with the agency); the review area was upheld by the Connecticut Supreme Court in Queach Corporation v. Inland Wetlands Commission.Source: Queach Corporation v. Inland Wetlands Commission (2001) |
|---|---|
| Water company and watering rule | South Central Connecticut Regional Water Authority. No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the RWA issues drought advisories when reservoir levels require them, so check rwater.com before scheduling a new lawn. Private wells are not on a utility schedule.Verifyrwater.com |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Inside the coastal area under the Coastal Management Act (CGS 22a-94); the coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Branford|Sod installation in Branford |
| Last verified | September 3, 2026 |
Spotted a change in Branford? Report a change.
Bridgeport
Bridgeport is on Aquarion's mandatory twice-weekly watering schedule; its wetlands setback is being confirmed.
| Wetlands agency and setback | |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31. Added to the mandatory program in 2026.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Long Island Sound frontage; waterfront grading and fill can require coastal site plan review. The coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Bridgeport|Sod installation in Bridgeport |
| Last verified | September 3, 2026 |
Spotted a change in Bridgeport? Report a change.
Burlington
Burlington's wetlands setback is being confirmed against the current town regulations.
| Wetlands agency and setback | Inland Wetlands agency. Upland review area distance to be confirmed against the current regulations.VerifyReported at more than 600 feet in a 2006 statewide survey; verify the current regulation.burlingtonct.us |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Burlington|Sod installation in Burlington |
| Last verified | September 3, 2026 |
Spotted a change in Burlington? Report a change.
Canaan
Canaan (Falls Village) runs wetlands through its own commission; the regulated-area distance is being confirmed.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission is the town's sole wetlands agency. The regulated-area distance is being confirmed against the town regulations.VerifyA.H. Howland regulations index |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Canaan|Sod installation in Canaan |
| Last verified | September 3, 2026 |
Spotted a change in Canaan? Report a change.
Canterbury
Canterbury regulates clear-cutting in wetlands under its own regulations; the review distance is being confirmed.
| Wetlands agency and setback | Inland Wetlands and Watercourses agency. Regulates clear-cutting of trees in wetlands under its own regulations (2006 legislative report); the upland review area distance is being confirmed.Verifycanterburyct.org |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Canterbury|Sod installation in Canterbury |
| Last verified | September 3, 2026 |
Spotted a change in Canterbury? Report a change.
Cheshire
Cheshire exempts routine maintenance on smaller residential lots as of right; its wetlands review distance is being confirmed.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. The regulations exempt, as of right, uses incidental to the enjoyment and maintenance of residential property of 80,000 square feet or less, including maintenance of existing landscaping, but not removal or deposition of significant amounts of material into or from a wetland or watercourse; the upland review distance is being confirmed against the current regulations.Verifycheshirect.org |
|---|---|
| Water company and watering rule | South Central Connecticut Regional Water Authority. No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the RWA issues drought advisories when reservoir levels require them, so check rwater.com before scheduling a new lawn. Private wells are not on a utility schedule.Verifyrwater.com |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Cheshire|Sod installation in Cheshire |
| Last verified | September 3, 2026 |
Spotted a change in Cheshire? Report a change.
Colebrook
Colebrook's wetlands commission is its sole wetlands agency; the regulated-area distance is being confirmed.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission is the town's sole wetlands agency. Regulations adopted January 16, 1974, last revised May 1, 2008. The regulated-area distance is being confirmed against the town regulations.VerifyA.H. Howland regulations index |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Colebrook|Sod installation in Colebrook |
| Last verified | September 3, 2026 |
Spotted a change in Colebrook? Report a change.
Cornwall
Cornwall's wetlands commission is its sole wetlands agency; the regulated-area distance is being confirmed.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission is the town's sole wetlands agency. Regulations adopted January 1, 1975, last revised March 20, 1992. The regulated-area distance is being confirmed against the town regulations.VerifyA.H. Howland regulations index |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Cornwall|Sod installation in Cornwall |
| Last verified | September 3, 2026 |
Spotted a change in Cornwall? Report a change.
Coventry
Coventry reviews any work within 150 feet of Coventry Lake and its named rivers, with a buffer table for other waters.
| Wetlands agency and setback | Inland Wetlands Agency. Any activity within 150 feet of Coventry Lake or the Skungamaug, Willimantic, and Hop rivers requires review; activities within a buffer setback that do not qualify for an Upland Activity Permit, and any activity in a designated wetland or watercourse, require a permit; for the general upland review distance, see the regulations' buffer setback table. The town offers a Minimal Impact Activity Permit for accessory structures with minimal clearing or grading up to 25 feet from wetlands or watercourses.coventry-ct.govSource: coventry-ct.gov Inland Wetlands and Watercourses page |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Coventry|Sod installation in Coventry |
| Last verified | September 3, 2026 |
Spotted a change in Coventry? Report a change.
Darien
Darien runs wetlands through its Environmental Protection Commission and is on Aquarion's mandatory watering schedule; the setback distance is being confirmed.
| Wetlands agency and setback | Environmental Protection Commission (EPC); Environmental Protection Officer Richard Talamelli. Upland review area distance to be confirmed against the Darien IWW Regulations.Verifydarienct.gov Environmental Protection Commission |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Long Island Sound frontage; waterfront grading and fill can require coastal site plan review. The coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Darien|Sod installation in Darien |
| Last verified | September 3, 2026 |
Spotted a change in Darien? Report a change.
Deep River
Deep River's Conservation and Inland Wetlands Commission regulates grading, excavating, and filling within 100 feet of wetlands and watercourses.
| Wetlands agency and setback | Conservation and Inland Wetlands Commission. Upland review area 100 feet; grading, excavating, and filling within it are regulated.deepriverct.usSource: deepriverct.us |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Inside the coastal area under the Coastal Management Act (CGS 22a-94); the coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Deep River|Sod installation in Deep River |
| Last verified | September 3, 2026 |
Spotted a change in Deep River? Report a change.
East Hampton
East Hampton's wetlands review area runs 100 feet, wider along its named rivers, and the town joined Aquarion's mandatory schedule in 2026.
| Wetlands agency and setback | Inland Wetlands and Watercourses Agency. Upland review area: 100 feet from any wetland or watercourse; 150 feet from the Salmon River and Pine Brook; 150 feet from the Connecticut River; 200 feet from wetlands and watercourses within a designated area named in the regulations.easthamptonct.govSource: East Hampton IWWA Regulations (easthamptonct.gov) |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31. East Hampton was added to the mandatory program in 2026.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in East Hampton|Sod installation in East Hampton |
| Last verified | September 3, 2026 |
Spotted a change in East Hampton? Report a change.
East Haven
East Haven's wetlands setback is being confirmed, and the town is inside the coastal area.
| Wetlands agency and setback | Inland Wetlands Commission. Upland review area distance to be confirmed against the current regulations.VerifyReported at 50 feet in 2011; verify the current regulation with the Inland Wetlands Commission. |
|---|---|
| Water company and watering rule | South Central Connecticut Regional Water Authority. No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the RWA issues drought advisories when reservoir levels require them, so check rwater.com before scheduling a new lawn. Private wells are not on a utility schedule.Verifyrwater.com |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Inside the coastal area under the Coastal Management Act (CGS 22a-94); the coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in East Haven|Sod installation in East Haven |
| Last verified | September 3, 2026 |
Spotted a change in East Haven? Report a change.
East Lyme
East Lyme tripled its wetlands review area to 300 feet in 2020, and it covers tree cutting, stumping, grubbing, and grading.
| Wetlands agency and setback | Inland Wetlands Agency. Upland review area 300 feet from a wetland or watercourse boundary, extendable where there is potential for impact; any work including tree cutting, stumping, grubbing, and grading inside 300 feet requires a permit. The 300-foot review area was adopted in late 2020, tripling the prior 100 feet, after the agency debated 500 feet.eltownhall.comSource: eltownhall.com Inland Wetlands page; Connecticut Examiner, November 20, 2020 |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Long Island Sound frontage; waterfront grading and fill can require coastal site plan review. The coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in East Lyme|Sod installation in East Lyme |
| Last verified | September 3, 2026 |
Spotted a change in East Lyme? Report a change.
Easton
Easton is on Aquarion's mandatory twice-weekly watering schedule; its wetlands setback is being confirmed.
| Wetlands agency and setback | |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Easton|Sod installation in Easton |
| Last verified | September 3, 2026 |
Spotted a change in Easton? Report a change.
Enfield
Enfield's wetlands review area is 100 feet, extending to 200 feet along the Connecticut and Scantic Rivers and two named brooks.
| Wetlands agency and setback | Inland Wetlands and Watercourses Agency (applications through Planning and Zoning). Clearing, filling, excavation, paving, grading, and stormwater discharge in and within 100 feet of any wetland or watercourse are regulated; the review area extends to 200 feet along the Connecticut and Scantic Rivers, Beamans Brook, and Freshwater Brook upstream of the Elm Street crossing (excluding tributaries).enfield-ct.govSource: enfield-ct.gov Inland Wetlands page |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Enfield|Sod installation in Enfield |
| Last verified | September 3, 2026 |
Spotted a change in Enfield? Report a change.
Essex
Essex reviews work within 100 feet of wetlands and watercourses, and the town is inside the coastal area.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Upland review area 100 feet from wetlands or watercourses; the Commission may regulate more distant activity likely to affect a resource.essexct.govSource: essexct.gov IWWC Regulations and FAQ |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Inside the coastal area under the Coastal Management Act (CGS 22a-94); the coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Essex|Sod installation in Essex |
| Last verified | September 3, 2026 |
Spotted a change in Essex? Report a change.
Fairfield
Fairfield uses a single 100-foot review area across 11 watersheds and launched Connecticut's first municipal online wetlands screening tool in 2025, so you can check your lot before you call.
| Wetlands agency and setback | Conservation Commission acting as the Inland Wetlands and Watercourses Agency; Conservation Department Wetlands Compliance Officer with public counter hours Monday to Friday 8:30 to 10:30 a.m. One standard upland review area of 100 feet from any wetland soil or watercourse. Regulations updated effective July 1, 2023. In August 2025 the Conservation Department launched an online Wetlands Screening Tool showing wetlands, watercourses, and the 100-foot review area by parcel; the town notes that many Fairfield wetlands are not obviously wet at the surface.fairfieldct.gov Inland Wetlands ProgramSource: fairfieldct.gov Inland Wetlands Program; fairfieldct.org screening tool announcement August 20, 2025 |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Harbor Management Commission jurisdiction is a checkbox on the town's wetlands application. The coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Fairfield|Sod installation in Fairfield |
| Last verified | September 3, 2026 |
Spotted a change in Fairfield? Report a change.
Glastonbury
Glastonbury's wetlands review area is 100 or 150 feet depending on location, and the MDC supplies part of the town.
| Wetlands agency and setback | Inland Wetlands and Watercourses Agency (Community Development, Planning and Environmental). A wetlands permit or other approval is required for any activity within a wetland or watercourse or its 100-foot or 150-foot upland review area, depending on location; a duly authorized agent may approve low-impact work without a full Agency hearing.glastonburyct.govSource: glastonburyct.gov Natural Resource Conservation page |
|---|---|
| Water company and watering rule | Metropolitan District (MDC) serves part of the town. No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the MDC issues voluntary conservation requests during dry periods and offers rebates for WaterSense smart irrigation controllers and rain sensors. Check themdc.org before scheduling a new lawn.Verifythemdc.org |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Glastonbury|Sod installation in Glastonbury |
| Last verified | September 3, 2026 |
Spotted a change in Glastonbury? Report a change.
Goshen
Goshen regulates any work within 100 feet of a wetland or watercourse.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulations adopted June 1974, last revised February 14, 2009. Regulated area is any wetland or watercourse and land within 100 feet of it.A.H. Howland regulations indexSource: Goshen IWW Regulations, as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Goshen|Sod installation in Goshen |
| Last verified | September 3, 2026 |
Spotted a change in Goshen? Report a change.
Greenwich
Greenwich has the widest wetlands setback in Fairfield County, a permanent Aquarion watering schedule, and a summer gas leaf blower ban that applies to your landscaper.
| Wetlands agency and setback | Inland Wetlands and Watercourses Agency (IWWA). Upland review area 100 feet from wetlands and watercourses; 150 feet where the resource is inside a public drinking water supply watershed. Work in a wetland or watercourse or within those distances requires an IWWA permit; the town lists clearing vegetation, grading, and placing structures as permit-triggering activities. Tidal wetlands are handled by Planning and Zoning under coastal rules.greenwichct.gov IWWA FAQsSource: greenwichct.gov IWWA FAQs |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31; in place in Greenwich since 2016.Aquarion watering scheduleSource: Aquarion CT watering schedule; greenwichct.gov Water Supply and Conservation |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). No town fertilizer ordinance located as of the verified date. |
| Coastal review | Yes. Long Island Sound frontage; waterfront grading and fill go through coastal site plan review. The coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verifygreenwichct.gov Planning and Zoning |
| Leaf blower and landscaping hours | Code of Ordinances Chapter 6B (Noise), adopted by the RTM January 16, 2024. Gas-powered leaf blowers are prohibited in residential zones from 6 p.m. the Friday before Memorial Day through September 30; on properties of two acres or more the prohibition ends the day after Labor Day. Any leaf blower may not be used 6 p.m. to 8 a.m. Monday through Friday, or 3 p.m. to 9 a.m. Saturday, Sunday, and holidays. Commercial gas blowers are prohibited on Sundays in residential zones. Lots of one-quarter acre or less may be serviced by one blower at a time. Electric blowers are allowed year-round. Violations to police non-emergency 203-622-8006.greenwichct.gov Noise OrdinanceSource: greenwichct.gov Noise Ordinance page; Greenwich Time, July 2024 |
| Local sod pages | Sod delivery in Greenwich|Sod installation in Greenwich |
| Last verified | September 3, 2026 |
Spotted a change in Greenwich? Report a change.
Groton
Groton's wetlands review area is 100 feet, wider around named brooks and streams, and the town is on Aquarion's mandatory watering schedule.
| Wetlands agency and setback | Upland review area 100 feet, expanding to 200 feet around five brooks and 150 feet around four streams named in the regulations.Source: Connecticut Examiner, November 20, 2020 |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31. Groton and Mystic are both on Aquarion's list.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Inside the coastal area under the Coastal Management Act (CGS 22a-94); the coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Groton|Sod installation in Groton |
| Last verified | September 3, 2026 |
Spotted a change in Groton? Report a change.
Hartford
Hartford requires a wetlands permit within 100 feet of any wetland, watercourse, or floodplain, and the MDC supplies its water.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission (Department of Development Services). A permit is required for work within a wetland or watercourse or within the upland review area, defined as 100 feet from a wetland, watercourse, or floodplain.hartfordct.govSource: hartfordct.gov Apply for a Wetlands Permit |
|---|---|
| Water company and watering rule | Metropolitan District (MDC). No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the MDC issues voluntary conservation requests during dry periods and offers rebates for WaterSense smart irrigation controllers and rain sensors. Check themdc.org before scheduling a new lawn.Verifythemdc.org |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Hartford|Sod installation in Hartford |
| Last verified | September 3, 2026 |
Spotted a change in Hartford? Report a change.
Harwinton
Harwinton regulates clearing and grading within 100 feet of wetlands and backs it with a town fine ordinance.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulations adopted February 26, 1974, last revised March 24, 2008. Clearing, grubbing, filling, grading, paving, excavating, constructing, depositing or removing material, and discharging stormwater within 100 feet of any wetland or watercourse is regulated. The town has a separate ordinance establishing fines for wetlands violations.A.H. Howland regulations indexSource: Harwinton IWW Regulations, as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Harwinton|Sod installation in Harwinton |
| Last verified | September 3, 2026 |
Spotted a change in Harwinton? Report a change.
Hebron
Hebron puts a 300-foot review area around nine named wetland complexes and 100 feet around everything else.
| Wetlands agency and setback | Inland Wetlands and Watercourses Regulations dated October 13, 2005. Upland review area of 300 feet around nine named wetland complexes (Daly Swamp, Fawn Brook Marsh, Hope Valley Wetland, Jeremy River Floodplain Wetlands, Judd Brook Marsh, Merrow Swamp, Raymond Brook Marsh, Slocum Marsh, and Fawn Brook Floodplain Wetlands), an expanded corridor along Raymond Brook to the Jeremy River, and 100 feet from all other wetlands and watercourses.hebronct.comSource: Hebron IWW Regulations (hebronct.com) |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Hebron|Sod installation in Hebron |
| Last verified | September 3, 2026 |
Spotted a change in Hebron? Report a change.
Kent
Kent reviews work within 100 feet of wetlands and 200 feet of watercourses.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulations adopted July 1988, last revised February 12, 2005. Regulated area is any wetland or watercourse plus land within 100 feet of a wetland and within 200 feet of a watercourse.A.H. Howland regulations indexSource: Kent IWW Regulations, as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Kent|Sod installation in Kent |
| Last verified | September 3, 2026 |
Spotted a change in Kent? Report a change.
Killingly
Killingly's wetlands commission doubles as its Aquifer Protection Agency; the review distance is being confirmed.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission, Town Hall, 172 Main Street, 860-779-5312; the Commission also serves as the town's Aquifer Protection Agency. The regulations are published on the town site in sections; the upland review distance is in Section II (Definitions) and is being confirmed. A 2006 legislative report lists Killingly among towns whose regulations specifically restrict clear-cutting of trees in wetlands and, in some cases, upland areas.Verifykillinglyct.gov |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Killingly|Sod installation in Killingly |
| Last verified | September 3, 2026 |
Spotted a change in Killingly? Report a change.
Killingworth
Killingworth's wetlands setback is being confirmed against the current town regulations.
| Wetlands agency and setback | Inland Wetlands agency. Upland review area distance to be confirmed against the current regulations.VerifyReported at 500 feet around vernal pools in a 2006 statewide survey; verify the current regulation.townofkillingworth.com |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Killingworth|Sod installation in Killingworth |
| Last verified | September 3, 2026 |
Spotted a change in Killingworth? Report a change.
Litchfield
Litchfield's wetlands review distance is being confirmed against the current town regulations.
| Wetlands agency and setback | Inland Wetlands Commission; the Commission's 2025 minutes reference an upland review area but do not state the distance.Verify |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Litchfield|Sod installation in Litchfield |
| Last verified | September 3, 2026 |
Spotted a change in Litchfield? Report a change.
Madison
Madison's Inland Wetlands Agency reviews work within a 100-foot upland review area, and the town is inside the coastal area.
| Wetlands agency and setback | Inland Wetlands Agency. Upland review area 100 feet; town agendas list regulated-activity permits for patios, pools, and site improvements "within 100 ft upland review area."madisonct.orgSource: Madison IWA agenda, April 3, 2023 (madisonct.org) |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Inside the coastal area under the Coastal Management Act (CGS 22a-94); the coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Madison|Sod installation in Madison |
| Last verified | September 3, 2026 |
Spotted a change in Madison? Report a change.
Mansfield
Mansfield uses one of the wider standard review areas on this page at 150 feet from any wetland or watercourse.
| Wetlands agency and setback | Inland Wetlands Agency. Regulations dated November 15, 2017. Upland review area 150 feet from the edge of any wetland or watercourse, plus any area beyond 150 feet where the agency determines the activity is likely to affect the resource.mansfieldct.govSource: Mansfield IWA Regulations (mansfieldct.gov) |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Mansfield|Sod installation in Mansfield |
| Last verified | September 3, 2026 |
Spotted a change in Mansfield? Report a change.
Milford
Milford's wetlands review distance depends on the watershed, and the Regional Water Authority supplies the city rather than Aquarion.
| Wetlands agency and setback | Milford Inland Wetlands Agency, 70 West River Street, established by ordinance April 28, 1988. The size of the upland review area depends on which watershed the activity is in, and the Agency may regulate outside it.Verifyci.milford.ct.us |
|---|---|
| Water company and watering rule | South Central Connecticut Regional Water Authority. No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the RWA issues drought advisories when reservoir levels require them, so check rwater.com before scheduling a new lawn. Private wells are not on a utility schedule.Verifyrwater.com |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Long Island Sound frontage; waterfront grading and fill can require coastal site plan review. The coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Milford|Sod installation in Milford |
| Last verified | September 3, 2026 |
Spotted a change in Milford? Report a change.
Monroe
Monroe is on Aquarion's mandatory twice-weekly watering schedule; its wetlands setback is being confirmed.
| Wetlands agency and setback | |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31. Added to the mandatory program in 2026.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Monroe|Sod installation in Monroe |
| Last verified | September 3, 2026 |
Spotted a change in Monroe? Report a change.
New Canaan
New Canaan's wetlands setback is 50 feet, doubling to 100 feet in water supply watersheds, and its ordinance makes the contractor liable alongside the owner for every day a violation continues.
| Wetlands agency and setback | Inland Wetlands Commission (Environmental Commission acting as the wetlands agency). Upland review area 50 feet from wetlands and watercourses; 100 feet where they lie in the public drinking water supply watershed. Clearing, grubbing, filling, grading, excavating, depositing or removing material, and discharging stormwater in those areas are regulated. Under Town Code Chapter 33A, citations apply jointly and severally to the owner and the owner's agents, contractors, and subcontractors, and each day is a separate offense.newcanaan.info Inland Wetlands FAQsSource: newcanaan.info Inland Wetlands FAQs; New Canaan IWW Regulations; Town Code Ch. 33A |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in New Canaan|Sod installation in New Canaan |
| Last verified | September 3, 2026 |
Spotted a change in New Canaan? Report a change.
New Hartford
New Hartford reviews work within 50 feet of wetlands and 100 feet of watercourses, with a written as-of-right confirmation process.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulations last revised January 31, 2009. Regulated activity includes any earth-moving, filling, construction, or clear-cutting of trees within 50 feet of wetlands or 100 feet of watercourses. The town uses a separate non-regulated application so as-of-right work can be confirmed in writing before it starts.A.H. Howland regulations indexSource: New Hartford IWW Regulations, as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Aquarion serves part of New Hartford (Aquarion also runs the town's wastewater); confirm whether the mandatory irrigation schedule applies.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in New Hartford|Sod installation in New Hartford |
| Last verified | September 3, 2026 |
Spotted a change in New Hartford? Report a change.
New Milford
New Milford's wetlands review area runs 100 feet from wetlands and up to 200 feet from Candlewood Lake and its major rivers.
| Wetlands agency and setback | Inland Wetlands Commission. Upland review area: 200 feet from the ordinary high waterline of Candlewood Lake, the east and west branches of the Aspetuck River, the Still River, the Housatonic River, and watercourses within the West Aspetuck River watershed; 100 feet from the ordinary high waterline of any other watercourse; 100 feet from any wetland; whichever is greater.Source: New Milford IWW Regulations definitions (ecode360) |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in New Milford|Sod installation in New Milford |
| Last verified | September 3, 2026 |
Spotted a change in New Milford? Report a change.
Newtown
Newtown is on Aquarion's mandatory twice-weekly watering schedule; its wetlands setback is being confirmed.
| Wetlands agency and setback | |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Newtown|Sod installation in Newtown |
| Last verified | September 3, 2026 |
Spotted a change in Newtown? Report a change.
Norfolk
Norfolk's wetlands rules cover any earth moving, filling, construction, or clear cutting of trees within 100 feet of wetlands or watercourses.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulations adopted 1972, last revised August 2008. Regulated activity includes any earth moving, filling, construction, or clear cutting of trees within 100 feet of the edge of wetlands or watercourses.Source: Norfolk IWW Regulations as summarized by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Norfolk|Sod installation in Norfolk |
| Last verified | September 3, 2026 |
Spotted a change in Norfolk? Report a change.
North Canaan
North Canaan regulates earth moving, filling, and clear-cutting within 100 feet of wetlands and watercourses.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulations adopted May 23, 1988, last revised December 16, 2005. Regulated area is any inland wetland or watercourse and 100 feet beyond; any earth moving, filling, construction, or clear-cutting of trees within 100 feet is a regulated activity, and areas beyond 100 feet that affect a wetland are also subject to the regulations.A.H. Howland regulations indexSource: North Canaan IWW Regulations, as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in North Canaan|Sod installation in North Canaan |
| Last verified | September 3, 2026 |
Spotted a change in North Canaan? Report a change.
Norwalk
Norwalk's Conservation Commission will inspect your lot for wetlands at no charge before you plan a lawn, and the city has its own gas leaf blower ordinance.
| Wetlands agency and setback | Conservation Commission, acting as the Inland Wetland Agency since 1973. The city states that all watercourses, any small stream that feeds them, and any land within 100 feet of any watercourse is regulated by the agency. On-site wetlands inspections are available at no charge from the Senior Environmental Officer.Norwalk wetlands regulations guideSource: norwalkct.gov About the Agency; Norwalk IWW Regulations Summary |
|---|---|
| Water company and watering rule | Norwalk is not on Aquarion's mandatory list. Served by the First Taxing District Water Department and South Norwalk Electric and Water; confirm current conservation rules with the district.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Norwalk's Coastal Area Management boundary is drawn on the Building Zone Map. Single-family construction and additions are exempt from Coastal Site Plan Review unless the work is 1,000 square feet or more within 100 feet of a coastal resource; most work within 50 feet of a coastal resource such as tidal wetlands requires review. The coastal boundary line within town is narrower than the town line, and the town map controls.Source: norwalkct.gov Coastal Area Management page (Building Zone Regulations Article 6, Section 6.10.3) |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | City Code Chapter 61A, effective September 1, 2024. Internal-combustion leaf blowers are banned outright as of January 1, 2027 on properties of two acres or less and January 1, 2028 on larger properties. Landscape and gardening services are solely responsible for violations by their employees, each use on a property is a separate violation, and since September 1, 2023 crews running gas blowers must wear OSHA-approved ear and respiratory protection. Electric blowers may be used any day on impervious surfaces. Seasonal windows for lawn use and daily hours (weekdays 8 to 6, Saturday 10 to 5, Sunday and holidays 10 to 4 in the adopted draft) are in Chapter 61A, Section 61A-5; confirm current text in Section 61A-5.Source: ecode360 Norwalk Chapter 61A; norwalkct.gov Leaf Blower Ordinance page |
| Local sod pages | Sod delivery in Norwalk|Sod installation in Norwalk |
| Last verified | September 3, 2026 |
Spotted a change in Norwalk? Report a change.
Old Lyme
Old Lyme reviews work within 100 feet of wetlands and 400 feet of vernal pools, and the town is inside the coastal area.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission, established by ordinance October 21, 1963. Upland review area 100 feet around a wetland or watercourse and 400 feet around a vernal pool; any activity altering site hydrology that affects a wetland is also regulated.oldlyme-ct.govSource: oldlyme-ct.gov IWWC page |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Inside the coastal area under the Coastal Management Act (CGS 22a-94); the coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Old Lyme|Sod installation in Old Lyme |
| Last verified | September 3, 2026 |
Spotted a change in Old Lyme? Report a change.
Old Saybrook
Old Saybrook uses a 100-foot review area inland and a 50-foot review area around tidal wetlands, which DEEP itself regulates.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. 100-foot upland review area around inland wetlands, vernal pools, water bodies, and watercourses; tidal wetlands carry a 50-foot upland review area on the town map, with the tidal wetlands themselves regulated by DEEP.oldsaybrookct.govSource: oldsaybrookct.gov Official Inland Wetlands Map page |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Inside the coastal area under the Coastal Management Act (CGS 22a-94); the coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Old Saybrook|Sod installation in Old Saybrook |
| Last verified | September 3, 2026 |
Spotted a change in Old Saybrook? Report a change.
Plymouth
Plymouth regulates clearing and grading within 100 feet of wetlands and adds an aquifer protection notification.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulations adopted 1974, last revised October 9, 2007. Clearing, grubbing, filling, grading, paving, excavating, constructing, depositing or removing material, and discharging stormwater within 100 feet of any wetland or watercourse is regulated. The town also requires an aquifer protection notification with land use approvals.A.H. Howland regulations indexSource: Plymouth IWW Regulations, as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Plymouth|Sod installation in Plymouth |
| Last verified | September 3, 2026 |
Spotted a change in Plymouth? Report a change.
Redding
Redding is on Aquarion's mandatory twice-weekly watering schedule; its wetlands setback is being confirmed.
| Wetlands agency and setback | |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31. Added to the mandatory program in 2026.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Redding|Sod installation in Redding |
| Last verified | September 3, 2026 |
Spotted a change in Redding? Report a change.
Ridgefield
Ridgefield widened its wetlands review areas in 2020 and is on Aquarion's mandatory watering schedule.
| Wetlands agency and setback | Inland Wetlands Board, with a Wetlands and Conservation Inspector. Amendments effective September 4, 2020 set the base upland review area at 100 feet from the boundary of any wetland or watercourse, with a wider 150-foot review area measured from spring high water on specified water bodies, and expanded protection for vernal pools. Regulated activities are disturbance of soil and filling or removal of soil adjacent to or within wetlands and watercourses.Source: Ridgefield IWWR adopted regulations effective 9/4/2020; Ridgefield Press, September 16, 2020 |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Ridgefield|Sod installation in Ridgefield |
| Last verified | September 3, 2026 |
Spotted a change in Ridgefield? Report a change.
Rocky Hill
Rocky Hill regulates clear-cutting in wetlands under its own regulations, and the MDC supplies its water.
| Wetlands agency and setback | Inland Wetlands and Watercourses agency. Regulates clear-cutting of trees in wetlands under its own regulations (2006 legislative report); the upland review area distance is being confirmed.Verifyrockyhillct.gov |
|---|---|
| Water company and watering rule | Metropolitan District (MDC). No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the MDC issues voluntary conservation requests during dry periods and offers rebates for WaterSense smart irrigation controllers and rain sensors. Check themdc.org before scheduling a new lawn.Verifythemdc.org |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Rocky Hill|Sod installation in Rocky Hill |
| Last verified | September 3, 2026 |
Spotted a change in Rocky Hill? Report a change.
Roxbury
Roxbury reviews work within 100 feet of wetlands and 200 feet of the Shepaug River.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulations adopted August 23, 1973, last revised October 15, 2006. Regulated area: 200 feet from the ordinary high waterline of the Shepaug River; 100 feet from the ordinary high waterline of any other watercourse; 100 feet from all wetlands.A.H. Howland regulations indexSource: Roxbury IWW Regulations, as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Roxbury|Sod installation in Roxbury |
| Last verified | September 3, 2026 |
Spotted a change in Roxbury? Report a change.
Salisbury
Salisbury's 100-foot review area widens with slope to a 200-foot maximum, with its named lakes at 75 feet from shore.
| Wetlands agency and setback | Conservation Commission acting as the wetlands agency. Regulations adopted October 10, 2006. Upland review area 100 feet from any wetland or watercourse; where slope exceeds 5 percent, the distance grows by 5 feet for each additional 1 percent of slope, to a maximum of 200 feet; highly erodible soils are also reviewed. The town's four regulated named lakes remain at 75 feet from shore, and in 2025 the Commission asked each lake association whether its review area should change.A.H. Howland regulations indexSource: Salisbury IWW Regulations, as republished by A.H. Howland and Associates; Lakeville Journal, March 19, 2025 |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Salisbury|Sod installation in Salisbury |
| Last verified | September 3, 2026 |
Spotted a change in Salisbury? Report a change.
Seymour
Seymour's wetlands regulations name "site establishment of a new lawn" within 100 feet of a wetland as a regulated activity, in those words.
| Wetlands agency and setback | Inland Wetlands Commission (Town Code Appendix C). Upland review area 100 feet. Regulated activity expressly includes "site establishment of a new lawn" within 100 feet of wetlands or watercourses, along with buildings, decks, pools, parking areas, and septic systems.Source: Seymour Code of Ordinances, Appendix C, definitions |
|---|---|
| Water company and watering rule | South Central Connecticut Regional Water Authority. No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the RWA issues drought advisories when reservoir levels require them, so check rwater.com before scheduling a new lawn. Private wells are not on a utility schedule.Verifyrwater.com |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Seymour|Sod installation in Seymour |
| Last verified | September 3, 2026 |
Spotted a change in Seymour? Report a change.
Sharon
Sharon's wetlands commission is its sole wetlands agency; the regulated-area distance is being confirmed.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission is the town's sole wetlands agency. The regulated-area distance is being confirmed against the town regulations.VerifyA.H. Howland regulations index |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Sharon|Sod installation in Sharon |
| Last verified | September 3, 2026 |
Spotted a change in Sharon? Report a change.
Shelton
Shelton is on Aquarion's mandatory watering schedule, and the city checks building projects for regulated wetlands through a certificate of compliance.
| Wetlands agency and setback | Inland Wetlands Commission, City Hall, 54 Hill Street, third floor, 203-924-1555 ext. 1512; Inland Wetlands Administrator Ronald Baia. The city requires a certificate of compliance for all new construction, additions, detached structures, and pools to confirm whether regulated areas are present; specific buffer distances are set in the Commission's regulations and are not stated on the city page.Verifycityofshelton.org |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31. Added to the mandatory program in 2026.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Inside the coastal area under the Coastal Management Act (CGS 22a-94); the coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Shelton|Sod installation in Shelton |
| Last verified | September 3, 2026 |
Spotted a change in Shelton? Report a change.
Sherman
Sherman's wetlands setback is being confirmed against the current town regulations.
| Wetlands agency and setback | Inland Wetlands agency. Upland review area distance to be confirmed against the current regulations.VerifyReported at 200 feet around Candlewood Lake in a 2006 statewide survey; verify the current regulation. |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Sherman|Sod installation in Sherman |
| Last verified | September 3, 2026 |
Spotted a change in Sherman? Report a change.
Southbury
Southbury reviews work within 50 feet of wetlands and ponds and 100 feet of its named brooks and waterbodies.
| Wetlands agency and setback | Inland Wetlands and Watercourses. Upland review areas extend 50 feet from wetlands, watercourses, and ponds, and 100 feet from named watercourses and waterbodies, including Bullet Hill Brook, Eight Mile Brook, Transylvania Brook, and others named in the regulations.southbury-ct.orgSource: southbury-ct.org Inland Wetlands page |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Southbury|Sod installation in Southbury |
| Last verified | September 3, 2026 |
Spotted a change in Southbury? Report a change.
Stamford
Stamford's wetlands setback is the tightest on this list at 50 feet outside water supply watersheds, but it grows to 75 or 100 feet inside them, and the city is on Aquarion's mandatory schedule.
| Wetlands agency and setback | Environmental Protection Board (EPB), 888 Washington Boulevard, 203-977-4028. Regulations amended 2024. Upland review area: 50 feet from any wetland or watercourse not in a public water supply watershed; 75 feet from a wetland inside a public water supply watershed; 100 feet from a watercourse inside a public water supply watershed. Clearing, grubbing, filling, grading, excavating, depositing or removing material, and discharging stormwater in those areas are regulated. Maintenance of existing landscaping on a residential lot is permitted as of right, but removal or deposition of significant amounts of material is not.stamfordct.gov Environmental Protection BoardSource: Stamford IWW Regulations, EPB-approved draft June 20, 2024, Section 2 and Section 4.3(d) |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). No city fertilizer ordinance located as of the verified date. |
| Coastal review | Yes. EPB coordinates with Coastal Area Management staff for projects near coastal resources. The coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verifystamfordct.gov EPB |
| Leaf blower and landscaping hours | Stamford Noise Control Ordinance (Code Sec. 164) restricts gas-powered leaf blowers to 8 a.m. to 6 p.m. Monday through Friday and 10 a.m. to 3 p.m. Saturday and Sunday, except that from October 1 through December 31 they may run during the ordinance's daytime hours.Source: stamfordct.gov news release, June 14, 2023 |
| Local sod pages | Sod delivery in Stamford|Sod installation in Stamford |
| Last verified | September 3, 2026 |
Spotted a change in Stamford? Report a change.
Stonington
Stonington is on Aquarion's mandatory watering schedule and inside the coastal area; its wetlands review distance is being confirmed.
| Wetlands agency and setback | Inland Wetlands and Watercourses agency. Regulates clear-cutting of trees in wetlands under its own regulations (2006 legislative report); the upland review area distance is being confirmed.Verifystonington-ct.gov |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31. Stonington and Mystic are both on Aquarion's list.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Inside the coastal area under the Coastal Management Act (CGS 22a-94); the coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Stonington|Sod installation in Stonington |
| Last verified | September 3, 2026 |
Spotted a change in Stonington? Report a change.
Stratford
Stratford is on Aquarion's mandatory twice-weekly watering schedule; its wetlands setback is being confirmed.
| Wetlands agency and setback | |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31. Added to the mandatory program in 2026.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Long Island Sound frontage; waterfront grading and fill can require coastal site plan review. The coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Stratford|Sod installation in Stratford |
| Last verified | September 3, 2026 |
Spotted a change in Stratford? Report a change.
Thomaston
Thomaston regulates clearing and grading within 100 feet of wetlands, with an agent form for as-of-right work.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Clearing, grubbing, filling, grading, paving, excavating, construction, depositing or removing material, and discharging stormwater within 100 feet of any wetland or watercourse is regulated; the town uses an Agent Approval Form for non-regulated and as-of-right activities.A.H. Howland regulations indexSource: Thomaston IWW Regulations, as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Thomaston|Sod installation in Thomaston |
| Last verified | September 3, 2026 |
Spotted a change in Thomaston? Report a change.
Tolland
Tolland reviews work within 100 feet of watercourses and can double the review area on steep or erodible ground.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Upland review area 100 feet from a watercourse (wetland distance: verify with the Commission); the Commission can double the review area where slopes bordering the resource exceed 15 percent, where soils are highly erodible, or under other listed conditions. The town's own FAQ states the review area is not a prohibitory setback; work inside it may proceed with a permit.tollandct.govSource: tollandct.gov IWWC FAQ |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Tolland|Sod installation in Tolland |
| Last verified | September 3, 2026 |
Spotted a change in Tolland? Report a change.
Torrington
Torrington reviews work within 75 feet of wetland soils and 100 feet of watercourses.
| Wetlands agency and setback | Inland Wetlands Commission (Land Use Office; wetlands applications through the OpenGov portal since March 18, 2024). Regulations adopted July 16, 1978, last revised June 27, 2007. Upland review areas of 75 feet from any wetland soil type and 100 feet from any watercourse; the regulated-activity definition includes earth-moving, filling, construction, or clear-cutting of trees within 75 feet of wetlands or 100 feet of watercourses.torringtonct.orgSource: torringtonct.org Inland Wetlands Commission page |
|---|---|
| Water company and watering rule | Aquarion's Torrington Water Company; confirm whether the mandatory irrigation schedule applies.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Torrington|Sod installation in Torrington |
| Last verified | September 3, 2026 |
Spotted a change in Torrington? Report a change.
Trumbull
Trumbull reviews any activity within 100 feet of a wetland or watercourse and is on Aquarion's mandatory watering schedule.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission and Department, 366 Church Hill Road. The regulations require review of regulated activities within a 100-foot setback zone from wetlands and watercourses; any activity within that zone must be approved by the Commission.trumbull-ct.govSource: Trumbull Conservation Commission statement on the 100-foot setback (trumbull-ct.gov); Trumbull IWW Regulations (2/2/2010) |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Trumbull|Sod installation in Trumbull |
| Last verified | September 3, 2026 |
Spotted a change in Trumbull? Report a change.
Vernon
Vernon's wetlands review area is 100 feet, rising to 200 feet along the Hockanum and Tankerhoosen rivers and other named waters.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Upland review area 100 feet from any wetland, watercourse, or intermittent watercourse; 200 feet from the Hockanum River, Ogden Brook, Tankerhoosen River, Gage's Brook, Railroad Brook, Walker Reservoir East, and Valley Falls Pond. A 2006 legislative report lists Vernon among towns whose regulations specifically restrict clear-cutting of trees in wetlands and, in some cases, upland areas.Source: Vernon Inland Wetlands and Watercourses Regulations; OLR Report 2006-R-0242 |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Vernon|Sod installation in Vernon |
| Last verified | September 3, 2026 |
Spotted a change in Vernon? Report a change.
Wallingford
Wallingford restricts lawn equipment by ordinance and runs its own municipal water division.
| Wetlands agency and setback | |
|---|---|
| Water company and watering rule | Wallingford Water Division (municipal); confirm current conservation rules with the Division.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | Wallingford restricts lawn equipment by ordinance; verify current terms with the town.Verify |
| Local sod pages | Sod delivery in Wallingford|Sod installation in Wallingford |
| Last verified | September 3, 2026 |
Spotted a change in Wallingford? Report a change.
Warren
Warren's 100-foot wetlands review area widens where the slope climbs past 5 percent.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulations adopted June 28, 1974 (effective July 8, 1974), last revised January 9, 2012. Upland review area 100 feet from any wetland or watercourse, widening with slope above 5 percent.A.H. Howland regulations indexSource: Warren IWW Regulations, as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Warren|Sod installation in Warren |
| Last verified | September 3, 2026 |
Spotted a change in Warren? Report a change.
Washington
Washington reviews work within 100 feet of wetlands and can reach farther on steep slopes.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Upland review area 100 feet from any wetland or watercourse; the Agency may review activity on steep slopes (15 percent or more) beyond that distance.A.H. Howland regulations indexSource: Washington IWW Regulations (last revised February 3, 2009), as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Washington|Sod installation in Washington |
| Last verified | September 3, 2026 |
Spotted a change in Washington? Report a change.
Watertown
Watertown reviews work within 100 feet of any wetland boundary or watercourse bank.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulations adopted June 4, 1973, last revised April 27, 2009. Regulated within 100 feet of the boundary of any wetland or the top of bank of any watercourse; the town publishes standard conditions of approval for wetlands permits.A.H. Howland regulations indexSource: Watertown IWW Regulations, as republished by A.H. Howland and Associates |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Watertown|Sod installation in Watertown |
| Last verified | September 3, 2026 |
Spotted a change in Watertown? Report a change.
West Hartford
West Hartford requires an erosion control plan above half an acre, gets its water from the MDC, and its wetlands setback is being confirmed.
| Wetlands agency and setback | Inland Wetlands agency. Upland review area distance to be confirmed against the current regulation. A 2006 legislative report lists West Hartford among towns whose regulations specifically restrict clear-cutting of trees in wetlands and, in some cases, upland areas.VerifyReported at 150 feet, parcel-based, in a 2000 legislative report; verify the current regulation with the town.westhartfordct.gov |
|---|---|
| Water company and watering rule | Metropolitan District (MDC). No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the MDC issues voluntary conservation requests during dry periods and offers rebates for WaterSense smart irrigation controllers and rain sensors. Check themdc.org before scheduling a new lawn.Verifythemdc.org |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Soil erosion and sediment control plan required when the cumulative disturbed area exceeds one-half acre; a single-family dwelling not part of a subdivision is exempt from that section (Code Chapter 177).Source: West Hartford Code Chapter 177 (ecode360) |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in West Hartford|Sod installation in West Hartford |
| Last verified | September 3, 2026 |
Spotted a change in West Hartford? Report a change.
Westbrook
Westbrook requires applications for regulated activity within 100 feet of an inland wetland or watercourse, and shoreline lots also face coastal review.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Applications for regulated activity within 100 feet of an inland wetland or watercourse.westbrookct.usSource: westbrookct.us |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Long Island Sound frontage; waterfront grading and fill can require coastal site plan review. The coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Westbrook|Sod installation in Westbrook |
| Last verified | September 3, 2026 |
Spotted a change in Westbrook? Report a change.
Weston
Weston's 100-foot wetlands review area covers clearing, grading, and filling, and the town is on Aquarion's mandatory schedule for customers on public water.
| Wetlands agency and setback | Conservation Commission. Town Code Chapter 215. Any clearing, grubbing, filling, grading, paving, excavating, constructing, depositing or removing material, or discharging stormwater within 100 feet of any wetland or watercourse is a regulated activity.Weston Code Chapter 215Source: ecode360 Weston Chapter 215 |
|---|---|
| Water company and watering rule | Aquarion for customers on public water; mandatory twice-weekly sprinkler schedule, April 1 through October 31. Many Weston properties are on private wells.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Weston|Sod installation in Weston |
| Last verified | September 3, 2026 |
Spotted a change in Weston? Report a change.
Westport
Westport regulates landscaping within 20 feet of any wetland, bans gas leaf blowers all summer, and sits on Aquarion's mandatory watering schedule.
| Wetlands agency and setback | Conservation Commission and Conservation Department. Upland review area 100 feet. Separately, the regulations require a 20-foot buffer around all wetlands and watercourses for landscaping activities, defined to include the addition of soil, planting, and removal of vegetation; any landscaping inside 20 feet requires authorization from the Conservation Department and possibly the Commission, and department policy is to approve native plant species only. Setbacks for other activities vary by type, and where wetlands lie in an Aquifer Protection Overlay Zone or have slopes of 25 percent or more, vernal pools, or endangered species, a review setback of up to 100 feet may be required.westportct.gov Conservation Department FAQSource: westportct.gov Conservation Department FAQ; Westport IWW Regulations Section 7 |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | Yes. Long Island Sound frontage; waterfront grading and fill can require coastal site plan review. The coastal boundary line within town is narrower than the town line, and the town map controls. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | Town Code Chapter 42, Article III, passed by the RTM in January 2023. Handheld and backpack gas-powered leaf blowers are prohibited from May 15 through October 15. In allowed periods, gas blowers may run weekdays 8 a.m. to 6 p.m. and Saturdays 9 a.m. to 3 p.m.; prohibited on Sundays and state or federal holidays. Exemptions for town and state property, properties larger than 20 acres, public utilities, and storm cleanup. Complaints to leafblowercomplaints@westportct.gov.westportct.gov Leaf Blower OrdinanceSource: westportct.gov Gas-Powered Leaf Blower Ordinance page |
| Local sod pages | Sod delivery in Westport|Sod installation in Westport |
| Last verified | September 3, 2026 |
Spotted a change in Westport? Report a change.
Wethersfield
Wethersfield requires an erosion and sediment control plan once a project disturbs more than half an acre.
| Wetlands agency and setback | |
|---|---|
| Water company and watering rule | Metropolitan District (MDC). No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the MDC issues voluntary conservation requests during dry periods and offers rebates for WaterSense smart irrigation controllers and rain sensors. Check themdc.org before scheduling a new lawn.Verifythemdc.org |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Soil erosion and sediment control plan required when the cumulative disturbed area exceeds one-half acre (Code Article XII, Section A181-46).Source: Wethersfield Code Article XII (ecode360) |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Wethersfield|Sod installation in Wethersfield |
| Last verified | September 3, 2026 |
Spotted a change in Wethersfield? Report a change.
Willington
Willington reviews work within 100 feet of wetlands and 150 feet of the Fenton River and its named tributaries.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Upland review area 100 feet from wetlands and watercourses; 150 feet from the Fenton River and its tributaries, including Stiles, Curtis, Eldredge, Fishers, Tinkerville, and Kidder brooks.willingtonct.govSource: Willington IWW Regulations (willingtonct.gov) |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Willington|Sod installation in Willington |
| Last verified | September 3, 2026 |
Spotted a change in Willington? Report a change.
Wilton
Wilton is on Aquarion's mandatory twice-weekly watering schedule; its wetlands setback is being confirmed.
| Wetlands agency and setback | Inland Wetlands Commission, 238 Danbury Road, 203-563-0180; regulations Section 7 defines regulated areas. Upland review area distance to be confirmed.Verifywiltonct.org |
|---|---|
| Water company and watering rule | Aquarion. Mandatory twice-weekly sprinkler schedule, April 1 through October 31.Aquarion watering scheduleSource: Aquarion CT watering schedule |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Wilton|Sod installation in Wilton |
| Last verified | September 3, 2026 |
Spotted a change in Wilton? Report a change.
Windsor
Windsor regulates clear-cutting in wetlands under its own regulations, and the MDC supplies its water.
| Wetlands agency and setback | Inland Wetlands and Watercourses agency. Regulates clear-cutting of trees in wetlands under its own regulations (2006 legislative report); the upland review area distance is being confirmed.Verifytownofwindsorct.com |
|---|---|
| Water company and watering rule | Metropolitan District (MDC). No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the MDC issues voluntary conservation requests during dry periods and offers rebates for WaterSense smart irrigation controllers and rain sensors. Check themdc.org before scheduling a new lawn.Verifythemdc.org |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Windsor|Sod installation in Windsor |
| Last verified | September 3, 2026 |
Spotted a change in Windsor? Report a change.
Windsor Locks
Windsor Locks regulates work within 80 feet of a watercourse and within 40 feet of a wetland.
| Wetlands agency and setback | Inland Wetlands and Watercourses Commission. Regulated: clearing, grubbing, filling, grading, paving, excavating, depositing or removing material, and stormwater discharge within 80 feet of a watercourse or within 40 feet of a wetland.windsorlocksct.orgSource: windsorlocksct.org IWWC page |
|---|---|
| Water company and watering rule | Metropolitan District (MDC) serves part of the town. No standing mandatory irrigation schedule comparable to Aquarion's was located as of the verified date; the MDC issues voluntary conservation requests during dry periods and offers rebates for WaterSense smart irrigation controllers and rain sensors. Check themdc.org before scheduling a new lawn.Verifythemdc.org |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Inland town. |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Windsor Locks|Sod installation in Windsor Locks |
| Last verified | September 3, 2026 |
Spotted a change in Windsor Locks? Report a change.
Woodbury
Woodbury regulates clearing and grading within 100 feet of wetlands and can review work within 500 feet of a vernal pool.
| Wetlands agency and setback | Inland Wetlands and Watercourses Agency. Regulations amended April 28, 2025, effective May 23, 2025. Clearing, grubbing, filling, grading, paving, excavating, constructing, depositing or removing material, discharging stormwater, or locating a waste disposal system within 100 feet of a wetland or watercourse is regulated; the Agency may also regulate activity within 500 feet of a delineated vernal pool. A 2006 legislative report lists Woodbury among towns whose regulations specifically restrict clear-cutting of trees in wetlands and, in some cases, upland areas.woodburyct.orgSource: Woodbury IWWA Regulations (woodburyct.org); OLR Report 2006-R-0242 |
|---|---|
| Water company and watering rule | Not on Aquarion's mandatory list; confirm the utility.Verify |
| Fertilizer | Statewide phosphorus law applies (CGS 22-111yy). |
| Coastal review | No. Not in the coastal area defined by the Coastal Management Act (CGS 22a-94). |
| Fill, grading, and topsoil permits | Statewide half-acre erosion and sediment control rule applies (CGS 22a-329); town fill and grading permit thresholds: verify with Planning and Zoning.Verify |
| Leaf blower and landscaping hours | No town ordinance located as of the verified date.Source: OLR Report 2024-R-0177 |
| Local sod pages | Sod delivery in Woodbury|Sod installation in Woodbury |
| Last verified | September 3, 2026 |
Spotted a change in Woodbury? Report a change.
Connecticut lawn rules: quick answers
Is phosphorus fertilizer illegal in Connecticut?
Can I use starter fertilizer on new sod in Connecticut?
Does Connecticut limit nitrogen fertilizer on lawns?
What days can I water my lawn in Connecticut?
Can I water new sod every day in an Aquarion town?
Do I need a permit to put in a lawn near a stream or wetland in Connecticut?
Is my landscaper responsible if the work violates wetlands rules?
When can landscapers use gas leaf blowers in Greenwich?
When can landscapers use gas leaf blowers in Westport?
Does my town regulate lawn fertilizer beyond the state law?
Sources
- Connecticut General Statutes section 22-111yy
- Office of Legislative Research summary of Public Act 12-155
- UConn Soil Nutrient Analysis Laboratory, Your Lawn and the Phosphorus Law
- DEEP, Guidelines for Upland Review Area Regulations (1997)
- Aquarion, Connecticut Watering Schedule
- Aquarion, Connecticut Irrigation Variance Programs
- Aquarion, 2026 conservation schedule announcement (April 2, 2026)
- Town of Greenwich, IWWA FAQs
- Town of Greenwich, Water Supply and Conservation
- Town of Greenwich, Noise Ordinance
- City of Stamford, Inland Wetlands and Watercourses Regulations (2024 amendments)
- City of Stamford, Environmental Protection Board
- Town of Darien, Environmental Protection Commission
- Town of New Canaan, Inland Wetlands FAQs
- Town of New Canaan, Code Chapter 33A
- City of Norwalk, Guide to Inland Wetlands Regulations
- Town of Westport, Conservation Department FAQ
- Town of Westport, Inland Wetland and Watercourse Regulations
- Town of Westport, Gas-Powered Leaf Blower Ordinance
- Town of Weston, Code Chapter 215
- Town of Fairfield, Inland Wetlands Program
- Town of Fairfield, Wetlands Screening Tool announcement (August 20, 2025)
The rules above describe a job done in the right order: the wetlands check before the design, the water company variance before the sod order, fertilizer at installation and then by soil test, and a crew that knows which days and hours it can run equipment in that town.
CT Sod handles sod installation across Connecticut and will walk through the wetlands, watering, and town questions for a specific address before a quote.
Questions about your town's rules?
Call and we will talk through the wetlands, watering, and permit questions for your address before anything is ordered.