Skip to main content
Sod DeliverySod PrepSod Installation

Sod Project Video — Westport, CT

Westport 8000 Sod Prep Rock and Fill Morning

9 a.m. Friday — work underway in the lower yard: rock and construction fill that has to be hauled off before topsoil, with the separate pool build beyond and the established lawn above the retaining wall.

9 a.m. Friday — work underway in the lower yard: rock and construction fill that has to be hauled off before topsoil, with the separate pool build beyond and the established lawn above the retaining wall.