Sod Project Video — Westport, CT
Westport 8000 Sod Prep Rock and Fill Morning
9 a.m. Friday — work underway in the lower yard: rock and construction fill that has to be hauled off before topsoil, with the separate pool build beyond and the established lawn above the retaining wall.