Sod Project Video — Westport, CT
Westport 8000 Sod First Rolls Aerial Walkthrough
4:09 p.m. — grading and laying overlap: the machines finish their last passes while rolls keep coming off the pallets. That overlap is the only way 8,000 square feet fits in one working day.
More from this project

Westport 8000 Sod Back Wall Aerial Pass

Westport 8000 Sod Crew First Rows Close Pass

Westport 8000 Sod Crew Laying Rows Aerial Walkthrough

Westport 8000 Sod Evening Hover Aerial

Westport 8000 Sod Evening Poolside Aerial

Westport 8000 Sod Evening Progress Aerial Walkthrough

Westport 8000 Sod Evening Pull-Back Aerial

Westport 8000 Sod Evening Wide Aerial Walkthrough

Westport 8000 Sod Final Grade Aerial Walkthrough

Westport 8000 Sod First Course At The Edge

Westport 8000 Sod Following The Loader Aerial

Westport 8000 Sod Front Yard Loader Aerial

Westport 8000 Sod Full Property Aerial Tour

Westport 8000 Sod House-to-Pool Aerial Sweep

Westport 8000 Sod Pallet Shuttle Aerial

Westport 8000 Sod Staged Pallets Overhead

Westport 8000 Sod Pool Grade Aerial Pass

Westport 8000 Sod Property Overhead Aerial Walkthrough

Westport 8000 Sod Graded And Ready High Orbit

Westport 8000 Sod Prep Excavator Walkthrough

Westport 8000 Sod Prep Rock and Fill Morning

Westport 8000 Sod Prep Pool Wall Walkthrough

Westport 8000 Sod Prep Hand-Raking Walkthrough

Westport 8000 Sod Prep Afternoon Overview