Two new-construction homes sit side by side on Halsey Drive in Old Greenwich, Connecticut. The homeowners hired CT Sod directly to prepare their lawns and install sod: 5,000 square feet at one property and 4,500 square feet at the other, for a combined 9,500 square feet.
The lawn work starts below the grass. We brought in 100 cubic yards of screened topsoil across the two properties, spread it with a track loader where access allowed, and used our small stand-on mini skid and hand raking where the space was extremely tight. These walkthroughs document the preparation stage, before the sod goes down.
Project update — November 17, 2026: topsoil spreading and grading are documented below. Sod installation is scheduled for the afternoon of November 18, 2026; it has not been completed in this update. We will add the installation and finished-lawn footage to this same project story once that work is documented.
Two Homes, Two Lawn Areas, One Coordinated Preparation Job
New construction leaves a lawn as one of the final pieces of the property, but laying rolls over whatever surface is there is not the same as preparing a lawn. The soil needs to be spread and shaped around the home's finished walkways, steps and planting areas before the sod arrives.
On this Old Greenwich project, the work covers two separate homeowner properties. The 5,000-square-foot lawn and the 4,500-square-foot lawn each need their own finished preparation, even though the houses are neighbors. The 100 yards is the combined topsoil quantity for the job—not 100 yards per house, and not a claim that every part of either lawn received the same depth.
For the service behind this project, see sod preparation and grading and sod installation in Greenwich, CT. Old Greenwich is part of our Greenwich service area.
Spreading 100 Yards of Screened Topsoil
We used a track loader to move and spread the screened topsoil through the areas it could reach. With this amount of material, matching the equipment to the usable access is a major part of the work. The larger machine handles the open areas, while the crew works the edges and transitions that a bucket alone cannot finish.
The goal is a soil surface ready for sod, not simply a pile of new soil moved from one place to another. Spreading gets the material into position; grading and raking shape the surface around the lawn boundaries. The walkthrough below shows the prepared soil beside the house, patio and shed, before any fresh sod is installed.
Extremely Tight Access: Mini Skid and Hand Raking
One of the properties had extremely tight access. Rather than trying to force the larger loader through, we used our small stand-on mini skid to handle the soil in the restricted space. The crew then hand raked the soil to finish the areas that needed closer attention.
That is why having more than one machine matters. A track loader can move material efficiently in an open yard, but a narrow passage beside a home calls for a smaller machine and more hands-on work. On these two neighboring properties, the access conditions changed the method—not the goal of getting the ground prepared for sod.
The second walkthrough follows the soil around the home, through the narrow side-yard areas and toward the curved front walkway. It documents the preparation result; it is not footage of a completed sod lawn.
The equipment and the people have to fit the job. Here, CT Sod combined track-loader spreading, small stand-on mini-skid work and hand raking to prepare two lawns with different access constraints. It is a practical example of how we adapt our crew and equipment to the property rather than expecting every yard to fit the same setup.
Next Stage: 9,500 Square Feet of Sod Installation
As of this November 17 update, installation is scheduled for the following afternoon, November 18, 2026. One property is planned for 5,000 square feet of sod and the other for 4,500 square feet. Those are the planned lawn areas, not a statement that the sod is already installed.
Keeping the preparation and installation on this page will show the complete sequence: topsoil brought in, soil spread and graded, tight access handled, then sod laid and the finished lawns documented. The prep footage will stay here when the installation update is added so homeowners can see what went underneath the finished grass.
November does not automatically end sod installation season. The ground needs to be workable and unfrozen, and the farm needs to be able to cut sod. For the broader timing question, see how late you can lay sod in Connecticut. Once the sod is installed, moisture checks and appropriate watering still matter even in cooler weather; our new-sod aftercare guide covers that next stage.
Planning Topsoil, Grading and Sod in Old Greenwich
If you are finishing a new-construction lawn or replacing an existing one, send us the approximate lawn area and photos of the access—not just the open yard. Show narrow side passages, gates, steps and any finished walkways that affect how soil and sod can reach the work area.
Tell us whether you need topsoil spreading and grading together with installation, or sod installation over a base that is already prepared. We scope the work for the property and provide a written quote. You do not need to be a builder to arrange the job: the homeowners hired us directly for these two homes.
See Greenwich sod installation for preparation and installation options, or Greenwich sod delivery if you only need turf supplied for another crew. For another documented Greenwich project, see our Central Middle School sod installation.
Request a preparation and sod installation quote, or call (203) 806-4086.
Ready For A Finished Lawn?
Need it installed?
Sod-only crews, up to 30,000 sq ft a day across the Northeast.