Sod Project Video — Shelton, CT
Shelton 17000 Sod Install Morning Overview
Morning overview of the install — fresh rows advancing around the gazebo while pallets stage across the graded yard.
More from this project

Shelton 17000 Sod Finished Gazebo Flyover

Shelton 17000 Sod Finished House Aerial

Shelton 17000 Sod Finished Poolside Walkthrough

Shelton 17000 Sod Finished Property Overview

Shelton 17000 Sod Finished Street View

Shelton 17000 Sod Finished Lawn From Above

Shelton 17000 Sod Crew Laying Aerial

Shelton 17000 Sod Install Aerial Walkthrough

Shelton 17000 Sod Install Halfway Flyover

Shelton 17000 Sod Poolside Install Walkthrough

Shelton 17000 Sod Install Property Flyover

Shelton 17000 Sod Prep Walkthrough

Shelton 17000 Sod Finish Grading Walkthrough

Shelton 17000 Sod Final Prep Flyover

Shelton 17000 Sod Graded Yard Walkthrough